redsouther
Structural
- Dec 5, 2006
- 7
On the vast majority of load bearing CMU wall design we do in our office, the vertical bar spacing is established and all vertical bars are extend to the foundation via dowels. In other words, the vert bar spacing matches the dowel spacing. I am wondering if anyone has experience with only providing dowels at 50% of the verticals? In my particular case, I'm looking at specifying wall verticals at 24" o.c. and dowels at 48" o.c. Technically, the wall is fine with bars spaced at 48" all around, but would there be any benefit to providing additional bars that do not extend to the footing?