Agree with UCFSe, common in most of Florida at least, and is referred to as a "raked tie beam", which is a formed and poured beam at the top of the wall. Also like UCF said I think we would have them step it to maintain a min of 8" of the concrete.
Jed- not sure I completely understand your detail, but it may be difficult to get a high slump grout to slope properly, it tends to self level...