There is a power system, one Generator connected to 13.8kV Bus and one Step-up transformer 69/13.8kV primary side connected to the power grid, secondary connect to 13.8kV Bus.
Both generator and transformer have equipped with NGR for forming a low resistance grounding system.
Choose one of two NDS that be closed for grounding.
In general, the NDS of Generator side shall be closed rather than transformer side.
My question is
Is there anything have to take into account if close NDS of transformer side rather than Generator side.
THANKS!