We have a fixed roof tank with a flush type clean out door, which is required to be stress relieved in accordance with API 650.
The problem is that the tank fabricator installed the door into the tank without completing all the welds, but stress relieving was however performed on the incomplete section. Now I believe we have to apply another round of stress relieving after the completion final welds on site.
Thermal stress relieving is impractical at the project site, would it be possible to satisfy API 650 by applying acoustic / vibrating stress relieving?
Any suggestions to save this without having to replace the clean out door section?
Thanks
The problem is that the tank fabricator installed the door into the tank without completing all the welds, but stress relieving was however performed on the incomplete section. Now I believe we have to apply another round of stress relieving after the completion final welds on site.
Thermal stress relieving is impractical at the project site, would it be possible to satisfy API 650 by applying acoustic / vibrating stress relieving?
Any suggestions to save this without having to replace the clean out door section?
Thanks