CFA Construction

Status
Not open for further replies.

Catjacob

Civil/Environmental
Nov 23, 2006
37
Does anybody know how long shoule be taken to do a pile of 1050mm (or 3-1/2ft) diameter and 14m (50ft) long by a CFA in medium dense sand and no ground water
 
Replies continue below

Recommended for you

About 50 minutes as an average ( 5 minutes set-up, 15 minutes drilling and 30 minutes concreting ( 4" line and concrete ))if there is no reinforcement. This is an instantaneous output ( doesn't take into account starting ops in the beginning of the shift,cleaning everything at the end of the shift, stand-by time waiting for concrete, etc ).
 