geonebular
Geotechnical
- Oct 17, 2006
- 4
I have been tasked with preparing a pavement redesign for a residential development. The initial pavement design had 4 inches of bituminous base course of which I want to see if we can change to 2 or 3 inches and 2.5 inches of surface course. My question is in preparing my CBR samples my surcharge weight is going to be based on the ideal situation of a total of 4.5 inches of asphalt, after the test is run is there a conversion or rule of thumb which would allow me to estimate the CBR value if the surcharge weight for 5.5 inches of asphalt had been used? Because of time and equipment restraints I can't rerun the test with different surcharges.