However, my concern when starting this thread was to explore the potential for the caps to produce damaging transients. At this point, it appears that if they terminate the caps to load side of the M1 contactor and then run the capacitor leads through the CTs, they will have an installation that meets Code requirements and does not contribute any greater transients than the original system.