Good morning all.
The uploaded .PDF shows a condition for which I have to review the design. The dbl C5 is being suspended from an existing precast box beam and will support the bridge deck concrete placement.
I maintain that, since the dbl C5 cannot deflection upward between the hanger rods, the design model shown at the bottom is correct. The left hanger rod carries all gravity load.
If one were to assume a support about 1" to the right of the left hanger rod, then the shear between it and the left hanger rod becomes astronomical, as does the tension in the hanger rod.
Am I missing anything?