OK now that Ron as nicely answered your questions, let's then ask what you are going to do about some questions that may come up, such as "what should I do about a good sized peak reflection say half way to pile tip?", "what criteria is needed to reject acceptance of the pile?", "How do I evaluate pile suitability by some other method". Much depends on the job, such as are there many piles so a few can be ignored, or do I install another one, etc. You still need experienced help, such as at least having them comment on a print out of the display. How about load testing? Are you equipped if necessary?