v8landy
Chemical
- Jan 3, 2008
- 81
Hi
I am looking for assiatance to put some figures to a design requirement to move recovey bottoms slurry down a 6" line approx 30m.
We have 10bar G N2 onsite. Viscosity of slurry changes, but is general quite thick (figures to come).
Basic question is does it sound possible, and would I be able to show some sort of calculation?
Thanks
I am looking for assiatance to put some figures to a design requirement to move recovey bottoms slurry down a 6" line approx 30m.
We have 10bar G N2 onsite. Viscosity of slurry changes, but is general quite thick (figures to come).
Basic question is does it sound possible, and would I be able to show some sort of calculation?
Thanks