Thanks, Andy, for your quick response. However, I did not relate enough information about this problem. This caisson is really a pit with 2' thick walls and base slab. My concern is with construction of the pit and not the design. The site consists of 8 pits and I was looking for the most efficient way of construction. The client has requested that the liner remain in place.