I have a project where I need some help from another engineering company. I asked them to submit a proposal for their portion of the work and I was kind of shocked to see how much they wanted to do their work. While going over the numbers we got to drafting in which they were charging consulting engineering rates to do CAD drafting. Since 1/2 of the project is CAD work this was a large portion of the bill. Their reasoning was that their staff engineers do the drafting so that's why they charge so much. I asked why they didn't get someone to do CAD for them and they said that it wasn't efficient for them because they would spend as much time teaching the CAD guy the project as they would drafting it themselves.
Is it normal to charge full consulting engineering rates when doing drafting when you have staff engineers performing the task?