We have a situation (the site is in China) when we need to run a steel conduit with AC dynamometer signal wiring (Speed and Torque sensors) in the trench cross-section 600x600mm, and this trench has bottom installed power cable 10 kV (feeding other equipment). We definetely will try to separate these runs at a maximum, but are we looking for trouble? May be 10 kV cable should be additionally encased into grounded overall devider/case? Did anybody have a similar problem?