Buried Pipe Allowable Stress

Status
Not open for further replies.

bonkers

Mechanical
May 13, 2008
28
With reference to a buried natural gas pipeline road crossing, I have calculated the total combined stress on the pipe. I now have the % SMYS value. My question is what do I use for the maximun allowable limit for an ASME B31.8 location class (3)? Do I use the basic design factor(F) which is already used in the pipe design formula for an allowable limit? If so, this limit would be 50% SMYS but I have been using 62% SMYS from previous unsubstantiated sources. Does anyone know of a reference source?

Thanks for any help!
Bonkers
 
Replies continue below

Recommended for you

B31.4 (I have 2006) combined stress and other limits are shown in TABLE A402.3.5(a) Where it is indicated as F3 = 0.9 * SMYS

Unfortunately I do not have a B31.8, so check that for a similar table... and please let me know what it says.

**********************