cmbyrd77
Structural
- Aug 4, 2010
- 79
I have a bit of a quandary. I am doing a roof framing evaluation for a client that wants to install solar panels. Currently I am determining the design the loads on the existing structure. The project is for a small college and the facility that I am looking at is large and therefore probably has a capacity of over 500, bumping it up to a Occupancy Category III. However, with that being said, the portion I am looking at is a small bumpout that only houses a couple small classrooms, with much less than 500 occupants, putting it into a Occupancy Category II. I am curious to see what some of my other fellow professional's opinions are on this subject. Thank you for the help.