tbone73
Structural
- Apr 2, 2009
- 51
I have a cast in place post tensioned building with frames spaced at 27 feet typical and 62 feet beam spans supporting 7 inch slab. Lateral system is ordinary moment frames. The foundation type is auger cast pile groups with individual pile caps. Other engineers and I have been debating which type fixity to assume for these foundations at the column base/foundation interface.
Your thoughts are appreciated?
Your thoughts are appreciated?