Aug 17, 2005 #1 steveyeung Civil/Environmental Joined Sep 5, 2004 Messages 76 Location GB Does anybody have any idea about the time required for removing a steel bridge (of 10-15m long U-frame) carrying ballasted track?
Does anybody have any idea about the time required for removing a steel bridge (of 10-15m long U-frame) carrying ballasted track?
Aug 17, 2005 #2 DRC1 Civil/Environmental Joined Jan 26, 2002 Messages 1,328 Location US Workig around the clock we replaced about an 8 meter RR bridge and bridge seat/ backwalls over a road in one weekend. Old and new were plate girders with bolted ties. It would depend a lot on working conditions, location, etc. Upvote 0 Downvote
Workig around the clock we replaced about an 8 meter RR bridge and bridge seat/ backwalls over a road in one weekend. Old and new were plate girders with bolted ties. It would depend a lot on working conditions, location, etc.