TTWood
Civil/Environmental
- Aug 21, 2008
- 3
I have a small 32 foot bridge with some minor bridge scouring. Before the bridge gets scoured anymore I am looking at placing concrete around and underneath the bridge footings. I will lower the water level to try first but if unsuccessful I then will try underwater concrete bags and place them in the scour spots.
Does this sound reasonable to everyone here, I am a young Engineer and this seems the most practical to me. If you have any other ideas please throw them out there.
Does this sound reasonable to everyone here, I am a young Engineer and this seems the most practical to me. If you have any other ideas please throw them out there.