I think all suppliers of epoxy for construction have two or more set times. I checked and found that locally, Florida, that the fast set out sells the standard set three to one. The ratio of sales last month was 2 to 1 with the mention of heat being a problem. This month it should be closer to 50/50, again due to heat.