I need some suggestions............

I've got an existing refinery that some very old and very wide below grade pipe trenches.

I've got to route some new utility (power) under them (+/- 3'-0" below bottom of trench) In most areas, directional drilling will work.

In one area, I have no outlet access for directional drilling, so it looks like we're stuck hand digging (about 80', 3'-0"deep) around a very congested pipe area.

Any experience with trenching equipment that can be pushed through wet mud/sand that deep and that long?

Thanks in advance.

jjf
 
Replies continue below

Recommended for you

I would consider injecting epoxy grout before excavating and then perform your digging carefully. The epoxy will hold "gel" the soil and allows for excavation without undermining the existing footing or trench. I have used this successfully in the past.

Here is one of such product supplier Prime Resin

Good luck.


Lutfi
 
Lufti,

Thanks for the suggestion. I had seen some "ground freezing" where a cement grout was injected to fix shifting soils for removal.

Just didn't occur to me for this one.

jjf
 
Can you put down a pit and jack a casing through? How large is the conduit? Can you access both sides of the trench?
 