Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

BLOWDOWN TANK

Status
Not open for further replies.

82264

Mechanical
Joined
Mar 10, 2003
Messages
6
Location
PH
We have a case that we will use existing blowdown tank which was not actually used, this unit already passed the ASME Code Section VIII means to say all requirements were completed. We have now a new project which needs a blowdown tank, the design condition of this new project is slightly higher compared to the previous project in terms of SOT. And we are planning to use this blowdown tank but we have to plug other nozzles and add one in accordance to the orientation. This new project is also need ASME stamp, although this will be repaired through "R" code, but my question is do we have to re-hydrotest this although we planned to apply 100% RT? All constructive suggestions are most welcome.

Thank you

Leo
 
Probably,speak with your AIA and review current NBIC for alterations.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top