Good day,
the contractor is proposing to remove the blinding concrete under the slab on grade and replace it by a layer of tout venant of 200mm thickness. After compaction, he will place the vapor barrier then the steel bars.
My only concern is that i am worried for the vapor barrier since placing it above crushed stone may break it but other that, I think there is no problem regarding this issue.
Your thoughts ?
Thank you.
the contractor is proposing to remove the blinding concrete under the slab on grade and replace it by a layer of tout venant of 200mm thickness. After compaction, he will place the vapor barrier then the steel bars.
My only concern is that i am worried for the vapor barrier since placing it above crushed stone may break it but other that, I think there is no problem regarding this issue.
Your thoughts ?
Thank you.