IJR
Structural
- Dec 23, 2000
- 774
A huge pipe section not yet erected needs to be given extra strength. The pipe was underdesigned, already fabricated and at the shop.
How do you pals do it and please the fabricator?.
Thanx for all the support you pals give
regs
IJR
How do you pals do it and please the fabricator?.
Thanx for all the support you pals give
regs
IJR