Hi all, i've got an apparently simple problem, you can see in the image attached.
I have a beam B constrained with a pivot (don't know if this is correct, i'm italian) to a column.
To model this i had to input two pieces for the column and two pieces for the beam, this only to have a joint in the middle.
In this case i can't model the pivot with end releases because if i use an end release either on the column or on the beam i can only force the moment to be zero in the end of the beam/column, and this is not right because the beam and the column are connected in the joint, but they are not connected to each other!
is there a way to tell Sap that the two pieces of beam column are connected but they don't share moment?!
= a
I have a beam B constrained with a pivot (don't know if this is correct, i'm italian) to a column.
To model this i had to input two pieces for the column and two pieces for the beam, this only to have a joint in the middle.
In this case i can't model the pivot with end releases because if i use an end release either on the column or on the beam i can only force the moment to be zero in the end of the beam/column, and this is not right because the beam and the column are connected in the joint, but they are not connected to each other!
is there a way to tell Sap that the two pieces of beam column are connected but they don't share moment?!