AlexDring
Mechanical
- Dec 31, 2002
- 117
In steel detailing I remember a common gage for smaller beams of being 2.5 down from top of flange to start a bolted connection. Eg. simple beam tying into a column. What I cant remember is when that gauge turns into 3", what size of W flange is that? Does anyone know of a site that offers simple steel detailing rules of thumb or data pertaining too?