SSSHARMA
Petroleum
- Sep 1, 2003
- 12
I WOULD LIKE TO KNOW IF IT IS POSSIBLE TO DO BATCH PUMPING OF NAPTHA AND CRUDE THROUGH THE SAME PIPELINE AS WE ARE PALNNING TO USE ONLY ONE PIPE LINE TO TRANSPORT THE TWO PRODUCTS IN DIFFERENT BATCHES.
FURTHER IS IT POSSIBLE TO USE THE SAME PUMP TO THE TWO PRODUCTS.
ANY SIMILIAR CASE MAY ALSO BE REFERRED WHERE NAPTHA AND CRUDE ARE PUMPED IN BATCHES THROUGH ONE COMMAN PIPELINE
SSSHARMA
FURTHER IS IT POSSIBLE TO USE THE SAME PUMP TO THE TWO PRODUCTS.
ANY SIMILIAR CASE MAY ALSO BE REFERRED WHERE NAPTHA AND CRUDE ARE PUMPED IN BATCHES THROUGH ONE COMMAN PIPELINE
SSSHARMA