Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

BART FUBAR

Replies continue below

Recommended for you

Did they add new rolling stock?
System wide shutdowns were once a feature of Vancouver's Sky Train system each time new rolling stock was added.
 
Supposedly not; there was supposedly a problem "powering up" the control system during morning startup, since they shutdown at midnight every day.
 
I had to do a power reset the other day when the aircraft didn't come up clean.

There is usually a solar storm occurring when it happens to me. Need to dump the ground power earth for 2 mins then power up off batteries and start the APU and she will come up clean.
 

Part and Inventory Search

Sponsor