rgrayclamps
Mechanical
- Aug 6, 2004
- 376
I searched this topic and did not find any discussion.
On a drawing view, it is a general practice that balloons are placed in sequece (cw or ccw). I know that I can shuffle around "BOM" items through "BOM Contents" using "Row Up" or "Row down". Another way is shuffle component orders in the assembly. But both methods are not practical for a large assembly. Is there a better way? How do you guy handle balloon sequence control?
Thanks,
Alex
On a drawing view, it is a general practice that balloons are placed in sequece (cw or ccw). I know that I can shuffle around "BOM" items through "BOM Contents" using "Row Up" or "Row down". Another way is shuffle component orders in the assembly. But both methods are not practical for a large assembly. Is there a better way? How do you guy handle balloon sequence control?
Thanks,
Alex