loilfan
Mechanical
- Jan 20, 2015
- 122
I am designing a fitting to B31.3 that is a cored bar material NPT threaded on both ends with a 1/4" bleed in the middle of it. Is a hydrotest still required if no welding is performed? I think it does, but couldn't find anything in the Code that says one way or the other. Thanks!