cygnas
Mechanical
- Dec 21, 2004
- 76
To make my question as simple as possible, assume I have a sketched line 24" long. Now, I have a steel rod extruded along that line that I would like to automatically update based on the length of this line. Example, I make the line 30" long and the steel rod is now 30" as well. It seems like a relationship could be used here somehow. What is the best way to do this.
TIA,
Drake
When it comes to protecting yourself or your family it is better to be judged by 12 than carried by 6.
TIA,
Drake
When it comes to protecting yourself or your family it is better to be judged by 12 than carried by 6.