FuriousG
Chemical
- Feb 16, 2011
- 4
My company is initiating a new document control policy and we are split on the issue of revving submittal drawings to 'Fabrication Issue' when they come back approved.
We routinely send out submittal drawings for custom fabrications to consulting engineers for approval. Up until recently, when the drawing was approved and returned, it was up-revved before being issued to fabrication. Furthermore, the revision level after approval was switched from letter to number or vice-versa.
ASTM Y.14 35M & Y.14 100 speaks broadly of changing the revision of a drawing when transfer of design responsibility occurs. However, I believe this applies to documentation used between multiple organizations and is not necessarily applicable to releasing drawings for purchase & fabrication.
The issue is our drafters & drafting manager are convinced it is a waste of time to revise approved drawings if nothing has changed other than its ability to be purchased/fabricated. In their scenario a submittal drawing originally released at revision 'A' and approved by the customer would stay at revision 'A' throughout purchase & fabrication.
We routinely send out submittal drawings for custom fabrications to consulting engineers for approval. Up until recently, when the drawing was approved and returned, it was up-revved before being issued to fabrication. Furthermore, the revision level after approval was switched from letter to number or vice-versa.
ASTM Y.14 35M & Y.14 100 speaks broadly of changing the revision of a drawing when transfer of design responsibility occurs. However, I believe this applies to documentation used between multiple organizations and is not necessarily applicable to releasing drawings for purchase & fabrication.
The issue is our drafters & drafting manager are convinced it is a waste of time to revise approved drawings if nothing has changed other than its ability to be purchased/fabricated. In their scenario a submittal drawing originally released at revision 'A' and approved by the customer would stay at revision 'A' throughout purchase & fabrication.