TonyES
Structural
- Oct 2, 2007
- 37
I've been doing a lot of steel buildings lately where the prefab steel column sits on a pier (short column). ACI 10.9.1 says I need .01Ag of steel. Well my client is saying that his other engineer specifies half the reinforcement that I do. Is there some provision I'm not seeing or is the other engineer in the fault??