Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

ASME Sec. I / NDT / PW-11 / Table PW-11

MhmdNfri

Materials
Aug 7, 2024
1
Hi everybody,

according to ASME Sec. I,
do not we need any NDT for WATERTUBE BOILERS in the following situation:
- Pipe-to-pipe
- Circumferential weld
- NPS 10 (DN 250) (OD 27,4)
- Wall thickness 12,7mm
- Not Subject to Furnace Radiant Heat
- Contains Water
?

According to table PW-11, it is not required and
in PW-11 last paragraph it says:
" Experience has demonstrated that welded butt joints not requiring volumetric examination by these rules have given safe and reliable service even if they contain imperfections that may be disclosed upon further examination".

Is it correct if I prepare a "weld/NDT-Map" for this weld line without NDT?

Thanks in advance!
 
Replies continue below

Recommended for you

Part and Inventory Search

Sponsor