tonyuk53
Structural
- Jan 31, 2005
- 2
Hi,
I require to qualify submerged arc welders to ASME IX using process single wire (121) and tandem wire (123. Although the process and filler will remain the same does changing from single wire to twin wire become an essential variable. If qualified on twin wire does it automatically qualify him on single wire?
Thanks
I require to qualify submerged arc welders to ASME IX using process single wire (121) and tandem wire (123. Although the process and filler will remain the same does changing from single wire to twin wire become an essential variable. If qualified on twin wire does it automatically qualify him on single wire?
Thanks