ASCE 7-10 wind loads on roof mounted equipment

Status
Not open for further replies.

efsinc

Structural
Joined
Jun 1, 2008
Messages
68
Location
US
Would you consider the lateral force Fh (29.5-2) and the uplift force Fv (29.5-3) simultaneous on roof mounted equipment?
 
The uplift is practically canceling my dead load in my current application.
 
Yes. It will do that. Strap it down.
 