Incaraider
Industrial
- Jan 5, 2011
- 2
Good afternoon,
We are going to export to Australia one pressure vessel operating at 4 barg (design pressure 9 barg); designed and built according to BS PD 5500, could anyone please tell me if we have to certify the vessel during manufacturing or the end user is the one that has to do it once it arrives in Australia, this in accordance to the AS1210 standard.
Many Thanks,
Miguel
We are going to export to Australia one pressure vessel operating at 4 barg (design pressure 9 barg); designed and built according to BS PD 5500, could anyone please tell me if we have to certify the vessel during manufacturing or the end user is the one that has to do it once it arrives in Australia, this in accordance to the AS1210 standard.
Many Thanks,
Miguel