Geopave (and anyone else), thanks for your interest and help. The specific project is for an engineering justification for a shoring system that had been installed, functioned acceptably, and was cited by OSHA as not meeting the OSHA requirements found in 29CFR1926 Subpart P Appendix C.
The shoring system consisted of 2" by 6" maple heart vertical uprights with two ea 2" by 6" maple heart spreaders in a 7.5 foot deep trench. The bracing (sets) were spaced 4 feet apart along the tench.
The active earth pressure can be calculated using a number of methods including OSHA's. Cohesive soil has some ability to "arch" between supports, thus I am trying to develop some rational for applying a percentage of the total load between supports to each support. Any input would be appreciated.