dlybbert
Mechanical
- Feb 23, 2011
- 18
I seem to recall reading something about a maximum height for a land drilling rig, above which a dynamic structural analysis must be done. I cannot now find the reference. Does this ring a bell for anybody else?
"If it has been done... there is a better way."
"If it has been done... there is a better way."