Referring to API 650, Section 5.2.2.1, The tank manufacturer is allowed to set the sequence of welding the floor plates to allow for shrinkage.
What is the best sequence for welding out floor plates?
Should the Shell to Floor be welded out after floor is fully completed? What sections are best left to allow for shrinkage.
I am regarding a 18m 8mm floor with 10mm 1st shell strake.
Regards
SJKWS
CWI
What is the best sequence for welding out floor plates?
Should the Shell to Floor be welded out after floor is fully completed? What sections are best left to allow for shrinkage.
I am regarding a 18m 8mm floor with 10mm 1st shell strake.
Regards
SJKWS