The hydrotest is a short term non-repeating event that as noted usually only occurs when the tank is new. For these reasons a corrosion allowance is not added to the design shell thickness and the allowable stresses are higher than for long term product loading. Using a product design density of 1.0 (water) for oil tanks results in excess cost but purchasers may not realize that the hydrotest condition is a separately considered load case.