If this is 347 OL on the hydrocraker, eventually cracking of the overlay will occur and you will have to repair. At this time, I would agree with r6155 recommendation. Any repair procedure would have to be developed and signed off by a Licenced Engineer with experience in Divv.2 design. I have developed and supervized such repairs in the past. The Owner/Operator must agree. What do your company's or Owner's metallurgists have to say?