jm2804
Petroleum
- Feb 22, 2012
- 4
My question is, the welders for this particular job and the welding procedure are qualified on X60 pipe (group 2). X60 pipe was ordered for the project, after further investigation the MTR's show that the actual yield strength is 69,000. Does this mean that the welders and procedure need to be re-qualified for group 3 (>65,000)?