Hi All
Does anybody see any problems on this temporary operation:
We are replacing 2 transformers on a single DESN station. Two existing 110kV/14.2kV 20MVA transformers will be replaced by two 30MVA transformers. First one is going to happen in spring and the second one is to happen in fall, which means in summer we will have two dissimilar transformers working in parallell for about 4 months. The existing transformer has a LTC on secondary with +/- 10% in 16 steps and the new transformer also has a LTC on secondary with +/- 20% in 32 steps. The per step voltage difference is 1.25% for both old and new transformers.
The existing LTC control scheme is very simple, neither Master/Flowwer nor circulating current or var control but a single AVR having multiple Raise/Lower outputs that command to change both transformers' tap simultaneously.
We plan to keep using the existing LTC control, however, during summer there will be two different transformers.
So my question is - except for the load sharing issues between two transformers, do you see any problems with regard to using the existing the LTC control during summer time?
Thanks in advance!
Does anybody see any problems on this temporary operation:
We are replacing 2 transformers on a single DESN station. Two existing 110kV/14.2kV 20MVA transformers will be replaced by two 30MVA transformers. First one is going to happen in spring and the second one is to happen in fall, which means in summer we will have two dissimilar transformers working in parallell for about 4 months. The existing transformer has a LTC on secondary with +/- 10% in 16 steps and the new transformer also has a LTC on secondary with +/- 20% in 32 steps. The per step voltage difference is 1.25% for both old and new transformers.
The existing LTC control scheme is very simple, neither Master/Flowwer nor circulating current or var control but a single AVR having multiple Raise/Lower outputs that command to change both transformers' tap simultaneously.
We plan to keep using the existing LTC control, however, during summer there will be two different transformers.
So my question is - except for the load sharing issues between two transformers, do you see any problems with regard to using the existing the LTC control during summer time?
Thanks in advance!