rikz
Mechanical
- Apr 17, 2017
- 2
Hi All,
Recently in office we had a stern discussion regarding the input for deciding the anchor block design. It was regarding Anchor block sizing (for Saudi Aramco project);and the argument was whether the Anchor block to be designed for Design temperature or operating temperature. the civil department was worried with the high values of forces appearing in there spread sheet when considering the design temperature(230). Hence they were in favor for considering the operating temperature(115 deg F) which is very low considered to design temperature. Please note the buried CS material Gas pipeline complying to ASME B31.8 is , 24 inch size. Please give your most valuable comments......
Recently in office we had a stern discussion regarding the input for deciding the anchor block design. It was regarding Anchor block sizing (for Saudi Aramco project);and the argument was whether the Anchor block to be designed for Design temperature or operating temperature. the civil department was worried with the high values of forces appearing in there spread sheet when considering the design temperature(230). Hence they were in favor for considering the operating temperature(115 deg F) which is very low considered to design temperature. Please note the buried CS material Gas pipeline complying to ASME B31.8 is , 24 inch size. Please give your most valuable comments......