A.F
Structural
- Nov 23, 2020
- 41
An existing telecom tower footing.
Due to heavy water flow aroun half of the footing is exposed due to collapse of backfilling above the pad.
If backfilling to he restored any suggestion anout the procedure given the sxisting unaffected soil
Any proposal to protect the soil from heavy water flow is welcomed
Due to heavy water flow aroun half of the footing is exposed due to collapse of backfilling above the pad.
If backfilling to he restored any suggestion anout the procedure given the sxisting unaffected soil
Any proposal to protect the soil from heavy water flow is welcomed