Hi,
please refer to the attached sketch of a existing situation. The load down the column is being increased. This causes bending and shear failure. My thoughts are if I take the force in direct bearing through the cap to the pile and justify the top steel to hold it in place I can demonstate it will work. I will do this by working out the angle based on geometry, calculating the compressive and tension forces and checking. Please note that this is one cap connected to many others via tie beams. Any thoughts?
please refer to the attached sketch of a existing situation. The load down the column is being increased. This causes bending and shear failure. My thoughts are if I take the force in direct bearing through the cap to the pile and justify the top steel to hold it in place I can demonstate it will work. I will do this by working out the angle based on geometry, calculating the compressive and tension forces and checking. Please note that this is one cap connected to many others via tie beams. Any thoughts?