What does it mean? It means the ASME Boiler and Pressure Vessel code committee has not yet decided to include this specific material in Section II, Part D, and assign stress values. Instead, the use of this material is allowed on a provisional basis with assigned allowable stress values. You need to obtain a copy and read the code case.