we are designing API storage tank about 20m diameter,client required nozzle load calculation too but in API annex-p given as tank not less than 36m.What should i do for nozzle load calculation for 20m dia tank?if i get nozzle data from client can i do the analysis with WRC107?
Thanks all
we are designing API storage tank about 20m diameter,client required nozzle load calculation too but in API annex-p given as tank not less than 36m.What should i do for nozzle load calculation for 20m dia tank?if i get nozzle data from client can i do the analysis with WRC107?