I’m almost done writing my own Excel spread sheet for off-set base plates with vertical and moment loads (something Enercalc doesn’t have yet) and I’m looking for a little help deciphering the equation for Mpl in Example 15. I’m having “brain freeze”, where do they get the 0.67 in the numerator of the second term?