Good summary by Quark.
I will add that lots of people will say cubic metres per hr when they mean actually mean normal or standard conditions (we get it here all the time) and just don't specify that.
It's always a good idea to confirm that especiallyy if it's a number that is going to affect your project. Confirm also the pressure/temperature basis. There are several pressure bases used throughout the industry depending who you talk to and what their background is, they aren't all 1 atm/14.696 psia.